The Most Completed List of Pre-Construction Condo Projects
|
Total Count of Projects: 789
Address:
89 Niagara St Toronto, ON M5V 1C3
Approximately occupancy date:
Building size:
14
Builder:
Aspen Ridge Homes
Project Description:
The Essery is a new condo development by Aspen Ridge Homes currently in preconstruction at 109 Niagara Street, Toronto.
Address:
70 Mississauga Rd South Mississauga, ON L5H 2H3
Approximately occupancy date:
Building size:
Builder:
Diamondcorp and Dream and Fram + Slokker and Kilmer Group
Project Description:
Bridge House at Brightwater is a new condo development by Diamondcorp , Dream , Fram + Slokker and Kilmer Group currently in preconstruction at 70 Mississauga Road South, Mississauga.
Address:
206 King St West Hamilton, ON L8P 1A5
Approximately occupancy date:
Building size:
14
Builder:
Canlight Realty Corp.
Project Description:
Radio Arts is a new condo development by Canlight Realty Corp. currently in preconstruction at 206 King Street West, Hamilton. Radio Arts has a total of 122 units. Sizes range from 363 to 1020 square feet.
Address:
3194 Dundas St W, Toronto, ON M6P 2A3
Approximately occupancy date:
Building size:
8
Builder:
Gairloch Ltd.
Project Description:
Craft Residences is a new condo development by Gairloch currently in preconstruction at 3194 Dundas Street West, Toronto. Craft Residences has a total of 86 units.
Address:
The Gore Rd & Queen St East Brampton, ON
Approximately occupancy date:
Building size:
35
Builder:
Poetry Living and HBNG Holborn Group and TACC Developments
Project Description:
CityPointe Heights is a new condo development by Poetry Living , HBNG Holborn Group and TACC Developments currently in preconstruction at The Gore Road & Queen Street East, Brampton. CityPointe Heights has a total of 658 units.
Address:
490 St Clair Ave West Toronto, ON
Approximately occupancy date:2025
Building size:
33
Builder:
Canderel Residential and KingSett Capital
Project Description:
Forêt is a new condo development by Canderel Residential and Kingsett Capital currently in preconstruction at 490 Saint Clair Avenue West, Toronto. The development is scheduled for completion in 2025. Forêt has a total of 1000 units.
Address:
1625 Military Trail Scarborough, ON M1C 1B3
Approximately occupancy date:2025
Building size:
8
Builder:
Altree Developments
Project Description:
Highland Commons is a new condo development by Altree Developments currently in preconstruction at 1625 Military Trail, Toronto. Highland Commons has a total of 550 units.
Address:
151 City Centre Dr Mississauga, ON L5B 1M7
Approximately occupancy date:June 2024
Building size:
31
Builder:
Camrost-Felcorp
Project Description:
Exchange Signature Residences is a new condo development by Camrost Felcorp currently in preconstruction at 151 City Centre Drive, Mississauga. The development is scheduled for completion in 2024. Exchange Signature Residences has a total of 250 units. Sizes range from 555 to 888 square feet.
|
|
|
|
|
Listing added to your favorite list