The Most Completed List of Pre-Construction Condo Projects
|
Total Count of Projects: 812
Address:
500 Dupont St Toronto, ON M6G 1Y7
Approximately occupancy date:
Building size:
9
Builder:
Lifetime Developments
Project Description:
Oscar Residences is a new condo development by Lifetime Developments currently in preconstruction at 500 Dupont Street, Toronto. Oscar Residences has a total of 157 units.
Address:
25 Cordova Ave Etobicoke, ON M9A 1B2
Approximately occupancy date:Winter/Spring 2025
Building size:
20
Builder:
Tridel Corporation
Project Description:
Westerly Condos is a new condo development by Tridel currently in preconstruction at 25 Cordova Avenue, Toronto. The development is scheduled for completion in 2025. Westerly Condos has a total of 257 units. Sizes range from 509 to 1120 square feet.
Address:
51 Clarington Blvd Bowmanville, ON L1C 0A1
Approximately occupancy date:Summer 2024
Building size:
Builder:
Kaitlin Corporation
Project Description:
Presenting the evolution of modern downtown living. MODO Condo and Townhouse is a collection of incredibly vibrant condominium developments designed and constructed in modern downtown Bowmanville, just 35 minutes east of Toronto. Featuring 1-bedroom, 2-bedroom, and 3-bedroom condominium suites, many with dens, MODO Condo has something for everyone.
Address:
55 Dunlop St West Barrie, ON L4N 1A4
Approximately occupancy date:Summer 2024
Building size:
33
Builder:
Gary Silverberg
Project Description:
Début Waterfront Residences is a new condo development by Gary Silverberg currently in preconstruction at 55 Dunlop Street West, Barrie. The development is scheduled for completion in 2024. Début Waterfront Residences unit sizes range from 444 to 1653 square feet.
Address:
2343 Khalsa Gate Oakville, ON L6M 4J2
Approximately occupancy date:January 2024
Building size:
8
Builder:
Fernbrook Homes and Crystal Homes
Project Description:
Nuvo Condos is a new condo development by Fernbrook Homes and Crystal Homes currently in preconstruction at 2343 Khalsa Gate, Oakville. The development is scheduled for completion in 2024. Nuvo Condos has a total of 324 units. Sizes range from 466 to 962 square feet.
Address:
8 Wellesley St West Toronto, ON M4Y 1E7
Approximately occupancy date:2025
Building size:
55
Builder:
CentreCourt Developments and Bazis International Inc
Project Description:
8 Wellesley Residences is a new condo development by CentreCourt and BAZIS currently in preconstruction at 8 Wellesley Street West, Toronto. The development is scheduled for completion in 2025. 8 Wellesley Residences has a total of 599 units. Sizes range from 315 to 1300 square feet.
Address:
1333 Weber St East Kitchener, ON N2A 1C2
Approximately occupancy date:2023
Building size:
15
Builder:
Pamata Hospitality Inc
Project Description:
Elevate Condos is a new condo development currently in preconstruction at 1333 Weber Street East, Kitchener. Elevate Condos has a total of 544 units.
Address:
2430 Old Bronte Rd Oakville, ON L6M 4J2
Approximately occupancy date:Summer 2023
Building size:
8
Builder:
Brixen Developments Inc. and Queensgate Homes
Project Description:
The Bronte is a new condo development by Brixen Developments Inc. and Queensgate Homes currently in preconstruction at 2430 Old Bronte Road, Oakville. The development is scheduled for completion in 2023. The Bronte has a total of 129 units. Sizes range from 540 to 860 square feet..
|
|
|
|
|
Listing added to your favorite list