The Most Completed List of Pre-Construction Condo Projects
|
Total Count of Projects: 823
Address:
859 Eglinton Ave East, East York, ON M4G 2L5
Approximately occupancy date:Winter/Spring 2023
Building size:
14
Builder:
CentreCourt Developments
Project Description:
The Forest Hill Condominiums is a new condo development by CentreCourt currently in preconstruction at 859 Eglinton Avenue West, Toronto. The development is scheduled for completion in 2023. The Forest Hill Condominiums has a total of 350 units. Sizes range from 350 to 1150 square feet.
Address:
493 Main St South Brampton, ON L6Y 1N6
Approximately occupancy date:Fall 2022
Building size:
12
Builder:
i2 Developments
Project Description:
Stella at Southside Condos is a new condo and townhouse development by i2 Developments currently in preconstruction at 493 Main Street South, Brampton. Stella at Southside Condos has a total of 450 units.
Address:
2782 Barton St East Hamilton, ON L8E 2J8
Approximately occupancy date:2024
Building size:
13
Builder:
LJM Developments
Project Description:
LJM Tower is a new condo development by LJM Developments currently in preconstruction at 2782 Barton Street East, Hamilton. LJM Tower has a total of 246 units.
Address:
4880 Valera Rd Burlington, ON L7M 0H4
Approximately occupancy date:December 2022
Building size:
10
Builder:
Adi Development Group
Project Description:
Valera 2 is a new condo and townhouse development by Adi Development Group currently under construction at 4880 Valera Road, Burlington. The development is scheduled for completion in 2022. Valera 2 unit sizes range from 497 to 991 square feet.
Address:
2180 Lawrence Ave East Scarborough, ON M1P 2P8
Approximately occupancy date:2023
Building size:
21
Builder:
G Group Development Corp
Project Description:
The Borough Condos - Tower A is a new condo development by G Group Development Corp. currently in preconstruction at 2180 Lawrence Avenue East, Toronto. The development is scheduled for completion in 2023. The Borough Condos - Tower A has a total of 282 units.
Address:
65 Broadway Ave Toronto, ON M4P 1T9
Approximately occupancy date:November 2023
Building size:
39
Builder:
The Times Group Corporation
Project Description:
Sixty-Five Broadway Condos is a new condo development by Times Group Corporation currently in preconstruction at 65 Broadway Avenue, Toronto. The development is scheduled for completion in 2023. Sixty-Five Broadway Condos has a total of 403 units. Sizes range from 396 to 1978 square feet.
Address:
123 Portland St, Toronto, ON M5V 2N4, Canada
Approximately occupancy date:2021
Building size:
14
Builder:
Minto Group Inc.
Project Description:
Designed, by Sweeny & Co architects and U31, 123 Portland is rooted in a pre-modern aesthetic. The architecture focuses on establishing depth and texture with off-white pre-cast frames and rustic weathered steel detailing, while Juliette balconies, and dramatic French doors conspire to create a grid-like pattern.
Address:
89 Church St Toronto, ON M5C 2G3
Approximately occupancy date:
Building size:
47
Builder:
Minto Group Inc.
Project Description:
The Saint Condos is a New Condo development by Minto located at Church St & Adelaide St, Toronto.
|
|
|
|
|
Listing added to your favorite list